What We Do

Services

Every job below starts with a look at your yard and an honest number before any wood gets cut.

Home › Services

Everything we take on

Every job below is one we do ourselves across Irving.

Deck Installation

We lay out footings, frame the joists, and build the deck to the height and shape that fits your yard. We talk through pressure-treated pine, cedar, and composite boards before we start, so you know what you're paying for and what it'll look like in year five.

Deck Repair

Soft boards, wobbly stairs, and ledger boards pulling away from the house are the calls we get most. We replace what's rotted, re-set loose joist hangers, and check that the rest of the frame is still carrying weight the way it should.

Deck Staining & Sealing

Texas sun bleaches and dries out wood fast, and a deck left unsealed starts cupping and splitting within a couple of summers. We strip or pressure-wash the old finish, let the boards dry out fully, then apply a stain and sealer rated for UV and moisture.

Custom Deck Design

Multi-level decks, built-in benches, pergolas over part of the deck, we'll draw it out with you before any lumber gets cut. If you want stairs on two sides or a deck that wraps around a tree, we'll figure out the framing to make it work.

Deck Replacement

Sometimes the frame underneath is too far gone to patch, and it's cheaper in the long run to tear it off and start over. We'll tell you straight if that's where your deck is at instead of patching new boards onto a frame that won't hold.

Composite Decking Installation

Composite boards like Trex don't rot, but they still need the right gap spacing and fastener system or they'll buckle in the heat. We install hidden fastener systems so you don't see a single screw head across the whole deck surface.

Deck Railing Installation & Repair

A railing that moves when you lean on it is a loose post, not a cosmetic issue. We re-set posts into the frame with proper lag bolts or through-bolts, and keep baluster spacing under four inches for anyone with small kids around.

Deck Resurfacing

If your frame and footings are solid but the boards are cupped, gray, and splintering, we strip the old decking and put down new boards on the same structure. It costs less than a full rebuild and the deck looks new again.

Deck Framing & Structural Repair

This is the part nobody sees once the boards go down: joists, beams, posts, and footings. We check for rot at the ledger connection, undersized joists, and footings that have heaved or settled in our clay soil.

Screened Porch & Deck Combo

A lot of homeowners want part of the deck open and part of it screened in to keep the mosquitoes out in the evening. We frame both as one structure so the roofline and decking line up instead of looking like two separate projects bolted together.

How It Works

Four steps, and no surprises in any of them.

01

We come and look

You tell us what you want doing, we look at what is actually there, and we ask the awkward questions early.

02

You get a price

In writing, itemised, free. If something might add cost later we flag it now rather than at the end.

03

We do the work

Same crew throughout. We cover your floors, keep the dust down and tidy up before we leave each day.

04

We walk it with you

You point out anything you are not happy with and we fix it before the invoice, not after.

Where We Work

All of this, across Irving, TX

These are the cities and suburbs where this deck work gets done regularly.

Irving, TX
Dallas, TX
Fort Worth, TX
Arlington, TX
Plano, TX
Garland, TX
Grand Prairie, TX
Mesquite, TX
Carrollton, TX
Lewisville, TX
Grapevine, TX
Coppell, TX
Common Questions

Things worth asking

Questions that come up once an actual deck project is underway.

Do I need a permit to build a deck in Irving?
Most cities in the Dallas-Fort Worth area require a permit for any deck attached to the house or elevated more than about 30 inches off grade, Irving included. Permit requirements and inspection timing vary slightly by city, so it's checked against the specific address before framing begins.
How long does it take to build a deck?
A standard ground-level deck around 300 to 400 square feet typically takes one to two weeks from footings to final boards, weather allowing. Multi-level decks, built-in benches or a screened porch combination add time because of the extra framing involved.
Can a deck be built to fit a specific budget?
Deck size, decking material and railing style can all be adjusted to hit a target budget, and pressure-treated pine runs considerably less than composite decking. The framing underneath isn't a place to cut costs though, since undersized joists or shallow footings cause problems within a few years.
Do you guarantee your deck work?
Workmanship on deck installation and repair is covered for a set period after completion, with the specific terms spelled out in the written quote. Manufacturer warranties on composite decking or hardware are separate and are passed along at the time of purchase.
Who do I talk to once the deck project is underway?
The same crew that measures the yard and frames the deck is the crew on site day to day, rather than being handed off to a separate team. Any changes to the plan, like swapping decking material or adding a step, get confirmed before they're built.
What decking materials do you work with?
Pressure-treated pine, cedar and composite boards including brands like Trex are all installed regularly, each with different upkeep and lifespan. Pressure-treated pine costs least upfront but requires re-staining every two to three years in Texas sun, while composite costs more but doesn't need sealing.
Can I still use my backyard while the deck is being built?
Most of a yard stays usable during deck construction, though the immediate work area around the footings and framing must stay clear for safety. Staining and sealing require keeping foot traffic off the deck surface for at least 24 hours while it cures.
What do I need to do to prepare before deck construction starts?
Clearing furniture, grills and planters off the area where the deck or old decking sits makes the first day of work faster. Calling 811 to mark buried utility lines is handled as part of planning the footing locations before digging starts.
What happens if you find rotted framing once the old deck is torn off?
Hidden rot in joists, ledger boards or posts is common once the surface decking comes off, especially around the ledger where it attaches to the house. Any additional framing repair required is explained and priced before replacing it, rather than being a surprise on the final bill.
How do I maintain a deck after it's built?
Pressure-treated and cedar decking should be cleaned and re-sealed every two to three years to keep water from getting into the wood grain, especially with Texas sun and summer storms. Composite decking just requires regular washing to keep mildew off, but the fasteners and railing connections are worth checking once a year regardless of material.

Not sure what you need?

Describe the problem and we will tell you what it probably is. No obligation.

Call (469) 962-9302